Skip to content

Logistics center

In planning and construction · 2026 / 2027

Matuzići warehouse and logistics centre.

Storage is our next step. On our own land in Matuzići, right at the new Corridor Vc junction, we are building a centre for trading and manufacturing companies that are short of warehouse space — with a full service of receiving, safekeeping, commissioning and dispatch.

Warehouse location

Usorska bb
Matuzići
Doboj Jug

Land owned by Adakaz. The registered seat remains Kuršum 33; Usorska bb becomes the official address once construction is complete.

01Location

On the junction, not near it.

The plot sits at the new Corridor Vc junction. The motorway and the new M4 trunk road are built but not open to traffic yet — once they are, the motorway exit is seven hundred metres from the gate.

The Adakaz plot in Matuzići, with the viaduct of the new motorway section in the background.
The plot in Matuzići. In the background, the viaduct of the new section still awaiting opening.
Site plan: the Adakaz plot on the new M4 trunk road, with the Corridor Vc junction 0.7 km away and the river Usora to the west.
Site plan: the plot sits right beside the new M4 trunk road, with the Corridor Vc junction seven hundred metres away. The plan itself is labelled in Bosnian.

The junction from the air.

The warehouse site sits directly beside the new M4 trunk road and the Corridor Vc junction. The drone shots show the interchange as it stands today, next to the plot the centre is being built on.

Aerial view of the Corridor Vc junction at Matuzići, with the motorway viaduct crossing the river Usora.
The Corridor Vc junction and the viaduct over the Usora, immediately beside the warehouse site.
Aerial view of the loops of the new junction and the motorway bridge over the river Usora.
The loops of the new junction and the link to the M4 trunk road — the motorway exit is seven hundred metres from the gate.

On the map

Exactly where we are.

The plot in Matuzići, on the new M4 trunk road and at the Corridor Vc junction.

02Surfaces

The space.

01

4,440 m²

High-bay warehouse

02

600 m²

Office space

03

4,810 m²

Yard, parking and outdoor storage

03Logistics points

Why here.

The centre sits directly on the new M4 trunk road, right next to the motorway, two customs offices and the largest railway hub in Bosnia and Herzegovina.

Why here.
PointDistance
New M4 trunk road0 km
Motorway (about to open)0.7 km
Customs office Tešanj1 km
M17 trunk road1 km
Customs office Doboj2 km
Doboj railway station6.1 km
Tuzla65 km
Border crossing Brod70 km
Zenica75 km
Banja Luka110 km
Border crossing Gradiška115 km
Sarajevo137 km
Belgrade, Serbia250 km
Zagreb, Croatia250 km

04Planned services

What we will do in the warehouse.

All procedures will be covered by a WMS system.

  • Picking up goods from your company or a specific location
  • Storage
  • Commissioning
  • Cross-docking
  • Loading and unloading (handling)
  • Reloading and transport as needed
  • Delivery within Bosnia and Herzegovina and abroad

05Approach

Project by project, never off the shelf.

Together we analyse the processes and shape long-term warehouse logistics solutions, matched to the needs of each customer.

  1. 01

    By storage method

    Racking, block storage and stock rotation.

  2. 02

    By goods properties

    Dimensions, weight, sensitivity, packaging and traceability requirements.

  3. 03

    By additional work

    Commissioning, repacking, labelling and dispatch preparation.

06Next step

Need warehouse space in 2027?

Get in touch early. Capacity is allocated by agreement, according to each customer's processes and seasonality.